An intuitive search solution tailored to the needs of the energy industry.

Built on the Sirus Platform, and powered by the Flare Taxonomies, Intelligent Search delivers precise and complete search results, helping you find that document or data, no matter where it’s stored, in seconds.

Information Management for Decommissioning

A few years ago we wrote about how legacy hardcopy data – wellfiles, seismic sections, basemaps, paper folios accumulated through decades of mergers, license rounds and farm-ins – had a quiet habit of becoming unfindable. At the time, the phrase “I wish I could put my hands on that report” was, for most operators, an inconvenience. Today, for operators preparing to decommission, it is a growing regulatory and financial headache.

Three things have changed since we last looked at this.

The work has changed

The North Sea, and basins like it, are firmly in a decommissioning phase. The NSTA’s Decommissioning Glidepath has formalised what most operators already knew: you cannot plan, cost or execute a credible decommissioning programme without trusted information on what is in the well, on the seabed and on the platform. The OEUK 2024 Decommissioning Report put hard numbers behind that pressure – cost per platform well is up by a quarter since 2021, and cost per exploration and appraisal well is up by more than half. Every gap in the record now carries a price tag, and every box of paper sitting in offsite storage is potentially a contingency line in someone’s AFE.

That has shifted attitudes. Hardcopy data is no longer a tidy-up job that can be picked up between projects. For decommissioning teams, it sits squarely on the critical path. 

MiNDR’s core components of Intelligent Search, AI-assisted automatic tagging and regulatory compliance monitoring support operators with:

  • Regulatory Alignment: Operators are easily able to comply with NSTA well data reporting requirements for data and report delivery, through close integration with the NSTA’s Digital Energy Platform.
  • Data and Information Transparency: Giving a single source of truth for engineering documents that can be shared across operators and contractors.
  • Operational Efficiency: MiNDR is designed specifically to reduce the time and effort spent searching, validating, and classifying decommissioning data.
  • Data Confidence: MiNDR’s AI assisted metadata tagging process improves trust in information quality for decision-making, contractor engagement, and regulatory assurance during decommissioning.
  • Legal Compliance: Flare’s advanced suite of IM tools identify and accurately tag legacy knowledge no matter where or how it has been stored, enabling legal compliance with records retention requirements long after the decommissioning project has completed.

Effective decommissioning is built on a foundation of trusted information.

Flare’s industry-leading IM solution allows operators to quickly and cost effectively assess, optimise, and exploit all the information available to them to support good decommissioning decision making, and reliable decommissioning plan delivery across all phases of the Decommissioning Glidepath. 

Increased Cost

Platform vs Exploration & Appraisal — 2021 to 2024

2021 2024
Platform 2021: $2.8M, 2024: $3.4M. Exploration & Appraisal 2021: $4.2M, 2024: $7.0M.

* OEUK Offshore Decommissioning Report, 2024